合理的模具设计。在级进模中,下料顺序的安排有可能影响到冲压件成形的精度。针对冲压件细小部位的下料,一般先安排较大面积之冲切下料,再安排较小面积的冲切下料,以减轻冲裁力对冲压件成形的影响。
Reasonable mold design. In progressive die, the order of blanking sequence may affect the accuracy of stamping forming. In order to reduce the impact of punching parts, the punching and cutting blanking of ***all area is arranged in the light of the blanking of the ***all parts of the stamping parts.
管材的锯削:选用细齿锯条,当管壁锯透后随即将管子沿着推锯方向转动一个适当角度,再继续锯割,依次转动,直至将管子锯断。锯割时管子必须夹正。
Cutting of pipe: select a fine toothed saw blade, when the tube wall is sawed through a proper angle along the direction of the push saw, then continue sawing and turn, until the pipe is sawed. When sawing is cut, the pipe must be clamped.
清除冲压机床滑块底面、工作台面(或垫板平面)以及模具的上、下模座平面内的任何杂物或***。手工扳动冲压机床飞轮(或操纵点动按钮),调整上滑块到上死点位置,并转动调节螺杆,将连杆长度调到短(即闭合高度大)。
Remove any material or foreign object on the bottom of the stamping machine slide, working table (or pad plane), and the upper and lower die base of the mold. Manually pull the stamping machine flywheel (or point moving button), adjust the upper slider to the upper dead point, and rotate the adjusting screw, the length of the connecting rod to the shortest (i. e. the maximum height of the closed height).
版权所有©2025 产品网