检查、核对模具和冲压机床。在安装模具前,要确认冲压机床为冲压工艺指定的型号,并检查模具的尺寸、工作要求是否与指定冲压机床的技术参数(装模高度、滑块行程等)相匹配,冲压机床的状态足否良好。
Check and check die and stamping machine. Before installing the mould, it is necessary to confirm that the stamping machine is the designated type of the stamping process, and check the size of the die and the work requirements to match the technical parameters of the designated stamping machine (the height of the die, the slider stroke, etc.), and the state of the stamping machine is good or not.
将闭合的模具放置于雎力机工作台或垫板上适当位置,圣霖国际鱼尾板厂,如果使用气垫,先要放好顶杆,并标记好模具的摆放位置。
手动扳动冲压机床飞轮(或操纵点动按钮),使机床上滑块下行并停于下死点位置。
Place the closed mould on the bench or pad of the mandrel machine. If the air cushion is used, the ejector pin should be placed first and the placement of the mould should be marked.
Manually pull the flywheel of the stamping machine (or the moving button), so that the slider on the machine tool will be downhill and stop at the bottom dead center.
清除冲压机床滑块底面、工作台面(或垫板平面)以及模具的上、下模座平面内的任何杂物或***。手工扳动冲压机床飞轮(或操纵点动按钮),调整上滑块到上死点位置,并转动调节螺杆,将连杆长度调到***短(即闭合高度大)。
Remove any material or foreign object on the bottom of the stamping machine slide, working table (or pad plane),圣霖国际鱼尾板生产厂, and the upper and lower die base of the mold. Manually pull the stamping machine flywheel (or point moving button),圣霖国际鱼尾板, adjust the upper slider to the upper dead point, and rotate the adjusting screw, the length of the connecting rod to the shortest (i. e. the maximum height of the closed height).