黑龙江Gafloon卡弗龙服务周到「艾菲力塑胶」
作者:艾菲力塑胶2022/4/8 14:46:41







台州艾菲力塑胶有限公司***代理UK GAFLOON PIPE GROUP LTD(英国卡弗龙管道集团)给排水全系列产品的销前、售中及***服务。


'Taizhou aifeili Plastic Co., Ltd. is authorized to act as the agent of UK Gafloon Pipe Group Ltd.'in terms of pre-sale, in-sale and after-sale services for all series of water supply and drainage products.








公司加大国内外市场开发力度,以技术创新为驱动力,以技术开发为核心,加大科技投入力度,按照“标准化、成套化、规模化”的发展战略,致力打造GAFLOON(卡弗龙)品牌。房子的大动脉-卡弗龙管道

The company strengthens the development of domestic and international promotion, and takes technological innovation as the driving force, takes technological development as the core, increases the investment in science and technology, and strives to build Gafloon brand in accordance with the development strategy of 'standardization, complete set,specialization and scale'. The main artery of the house - Gafloon Pipe and fitting 







各地温度持续走低,特别是部分北方地区温度都下降到零度以下,进入冰冻期,因PVC管材在温度较低时低温脆性明显,易发生破管现象,现就PVC管材冬季使用注意事项说明如下:

一、管材搬运:

严格规范产品搬、运、装、卸管理,不得出现抛、摔、滚、拖现象,以防止对产品造成伤害。尤其在卸车过程中一定要轻搬轻放,运输至工地后要妥善保管,防止管材与尖锐物体接触摩擦。人员务必不能在管材上,以上行为会造成管道内壁龟裂,打压时出现多处爆管情况。

二、管沟挖掘:

1、管沟挖掘应考虑当地冻土深度,管线必须埋入冻土层以下,管线埋地深度一般在1.2~1.5米以下;管沟挖掘之宽度,应视管材外径,沟底宽为管外径加300毫米为宜;施工时不得人为践踏管材。

2、沟底应整理平整,不得有石块、砖块等杂物,如有坚硬物时必须加挖10cm并填沙夯实,然后再进行管线安装施工。管线弯曲时应在允许角度2°以内,不得出现管材的硬性弯曲现象。

三、管材铺设:

下管前检查管材是否损伤(特别承口与插口端),如有损伤及时更换,按规定削角(TS管:30-45°,活套管:20°)。不能把管材、件抛入沟中,应轻搬轻放。






一、开机前维修人员对主机各操作单元、主要部件进行检修。

1、检查主机齿轮箱,减速箱的油门是否正常;

2、检查主机和电器各部分是否工作正常,并检查排水是否打开,压缩空气压力是否正常;

3、检查主机防罩是否清洁;

4、检查螺杆冷却油路是否畅通;

5、检查所有操作开关的灵敏度及调速器是否为零,急停是否归位;

6、模具工负责对模具进行更换,并对模头的加热圈进行细致的检查确认正常后方可交付操作人员使用。

二、按要求装好生产模头、定型套及冷却箱两端密封胶垫,并调整好水箱内支架高度和定型套的高度基本一致。





商户名称:台州艾菲力塑胶有限公司

版权所有©2025 产品网