匀质防火保温板外墙外保温系统工程施工前应具备下列条件:
1 主体结构应验收合格;
2 应对基层墙面进行处理,基层墙面应坚实、平整,表面清洁,无油污、浮尘等影响粘结的附着物,并根据不同墙体采用相应的砂浆对基层墙体进行找平,找平层验收合格后方可施工保温层;
3 外门窗洞口尺寸、位置应符合设计要求,门窗框或附框应安装完毕并验收;
4 突出墙面的消防梯、管道、设备等的预埋件或连接件应安装完毕,并按外保温系统设计厚度预留出间隙;
5 施工机具和安全防护用品已准备齐全;
6 施工用吊篮或专用脚手架应搭设牢固,并验收合格。

轻匀质保温板制作流程
Production process of light uniform quality assurance temperature plate:
1. Raw materials such as cement and fiber are proportioned and pulped by the proportioning system, so that the raw materials are fully mixed and kept uniform.
2. Transport the slurry to the slurry storage tank, keep stirring to keep it uniform, send the slurry to the slurry storage tank and then to the headbox, and mix in the headbox to keep uniformity.
3. The billets fall off from the slurry forming cylinder, and are transported to the irrigation cutting place by the billet receiving machine. The longitudinal cutting edge of the billets is cut by the cutter. The residual materials are transported to the return mixer by the billet receiving machine, and then transported to the slurry storage tank for reuse after being stirred by the mixer.

匀质板的施工条件和环境
荣锦匀质板为您简单介绍施工条件与环境:
基层墙体:经过工程验收达到***验收质量标准的结构承重墙面或非承重墙面在找平层施工完毕后,待找平层干燥并已验收合格,即可进行外墙外保温施工。
门窗口:门窗洞口经验收,洞口尺寸位置达到设计和质量要求。
窗的保温:门窗的保温要按要求做特别的处理,应严格按照设计要求施工。
伸缩缝和装饰缝:伸缩缝的蕞大间距应符合图集的要求或与设计单位协商确定。
预埋管道:与外墙有关的管线、预埋件、支架等已安装到位,并预留出外保温的余地。
环境条件:施工现场环境温度和基层墙体表面温度在施工及施工后24小时内均不得低于5℃,风力不大于5级,雨天不能施工。

做为匀质板生产厂家,我们向来以质量控制为基础发展市场,多年来我们一年坚持质量苐一的原则。我们注重产品品质,质量好才能让客户放心,才能占据市场。同时,我们注重客户体验服务。我们说的再好,您在使用时体验不好,那技术参数再达标也不能说是一款质量好的产品。只有产品本身质量过硬,同时做好售前及***服务才算是真正做好了质量。
一、产品质量管控:只有我们生产的的匀质板产品质量过硬,这样客户才会放心向你购买,在质量管控方面我们从不松懈,从原料进厂到成品出库,层层把关,只把蕞好的匀质板交给您。
二、不断完善服务:每一件产品,都要做好售前、***服务,我们坚持7*12小时有技术人员值守,随时接听电话并为您解决问题。如果需要现场技术技术,我们会在2天内出发赶往现场。

版权所有©2025 产品网