3.
Installation Base:The soil texture should be firm and solid.
4.
During installation,雨水混流泵生产厂家, keep the pump axile in horizontal p ition.
5.The end of
water inlet pipe should be immersed under water in about one meter and far away
from the end of mud in about half meter.
6.After installing the pump,calculate the
suitable suction height and head.Under the stable water level condition,雨水混流泵维修,
注意功率是否突然增大或降低,流量扬程是否突然减少,如有应停车检查。
Pay more attention
to know if the power suddenly increases or reduces,雨水混流泵厂家, if the flow and head are
suddenly lessen, if it is,益阳市雨水混流泵, pls stop to check.
3、经常注意检查各部分螺丝是否因振动而松动,如松动应随时上紧。
Check all parts
screws if they are loose, tighten them after finding.
3、水泵出水量不足
The waer yield
of water is not enough
1、进水管路或叶轮有水草杂物
2、转速过低
3、输水高度过高
4、泵盖及叶轮磨损间隙过大
5、填料进气
6、马力不足
7、进水管口插入水中深度不够
1. There are waterweeds and sundries in
inlet pipes or impeller
2.The rotate speed is too low
3.Water delivery height is too high
4.The attrition gap between pump cover
and impeller is too large
5.The padding is air in
6.The horsepower is not engough
7.The depth of inlet pipe under water is
not enough
1、清除水草杂物
2、调整转数
3、降低输水高度
4、用纸垫调整间隙至正常
5、压紧或更换填料
6、加大马力
7、增加插入水中深度至一米左右
1.Clear the waterweeds and sundries
2.Ajust the rotate speed
3.Reduce the water delivery height
4.Add paper washers to adjust the gaps
5.Compact or change padding
6.Increase the horsepower
7.Make the depth of inlet pipe under
water to one meter
版权所有©2025 产品网